PM Surya Ghar Muft Bijli Yojana is a central government solar rooftop scheme launched by Prime Minister Narendra Modi on 13 February 2024. The main goal of this scheme is to provide free electricity to one crore households across India by installing rooftop solar panels on residential buildings. The government has set a total budget of ₹75,021 crore for this scheme, which will run till the financial year 2026-27. Under this scheme, eligible households can get a subsidy of up to ₹78,000 for installing rooftop solar systems up to 3 kW capacity. The scheme aims to provide up to 300 units of free electricity per month to poor and middle-income families, helping them save around ₹15,000 annually on electricity bills. As of March 2026, more than 63 lakh applications have been received on the official portal, and over 32 lakh households have already benefited from rooftop solar installations across the country. The government has disbursed ₹14,771 crore as Central Financial Assistance till December 2025 under this scheme.

In this article, you will get complete information about the PM Surya Ghar Muft Bijli Yojana. We will cover everything you need to know including the eligibility criteria to apply, step-by-step application process, required documents, how to check your application status, subsidy details, important dates, benefits, common mistakes to avoid, reasons for rejection, portal registration and login process, password reset steps, grievance redressal, latest updates, official links, contact details, and frequently asked questions. This guide is written in simple and easy-to-understand language so that every common citizen can easily understand and apply for the scheme without any confusion.
Overview of PM Surya Ghar Muft Bijli Yojana
PM Surya Ghar Muft Bijli Yojana is one of the biggest rooftop solar initiatives in the world. The scheme was officially launched on 13 February 2024 with a target to install rooftop solar systems in one crore households by March 2027. The scheme provides Central Financial Assistance (CFA) directly to residential consumers for installing grid-connected rooftop solar plants.
The subsidy rates are ₹30,000 per kW for systems up to 2 kW, and ₹18,000 per kW for additional capacity from 2 kW to 3 kW, with a maximum subsidy cap of ₹78,000. The scheme is implemented through the National Portal for Rooftop Solar, where consumers can register, apply, track status, and receive subsidies directly in their bank accounts through Direct Benefit Transfer (DBT). The scheme also promotes local manufacturing as solar modules must be manufactured in India and conform to MNRE standards.
| Particulars | Details |
|---|---|
| Scheme Name | PM Surya Ghar Muft Bijli Yojana |
| Also Known As | Rooftop Solar Yojana |
| Launch Date | 13 February 2024 |
| Implemented By | Ministry of New and Renewable Energy (MNRE) |
| Total Budget | ₹75,021 crore |
| Implementation Period | Till 31 March 2027 |
| Target Beneficiaries | 1 crore households |
| Maximum Subsidy | ₹78,000 |
| Maximum System Capacity | 3 kW for individual households |
| Free Electricity Benefit | Up to 300 units per month |
| Application Mode | Online through National Portal |
| Official Website | https://www.pmsuryaghar.gov.in |
Key Features of PM Surya Ghar Muft Bijli Yojana
The PM Surya Ghar Muft Bijli Yojana comes with several important features that make it beneficial for common households. Here are the key features of the scheme:
- Direct Subsidy Transfer: The subsidy amount is transferred directly to the beneficiary’s bank account through Direct Benefit Transfer (DBT) within 30 days of successful installation and DISCOM approval.
- High Subsidy Rates: The scheme offers up to 60% subsidy for systems up to 2 kW and 40% subsidy for systems between 2 kW and 3 kW, with benefits capped at 3 kW capacity.
- Free Electricity Benefit: Eligible households can get up to 300 units of free electricity per month, saving approximately ₹15,000 annually on electricity bills.
- Net Metering Facility: The scheme allows net metering, where surplus electricity generated by solar panels can be sold back to the grid, generating additional income for households.
- Collateral-Free Loans: Participating banks offer collateral-free loans up to ₹20 lakh for solar installation at interest rates between 7% to 13% per annum with EMI tenure of 5 to 10 years.
- Make in India Focus: Solar modules used under the scheme must be manufactured in India and conform to BIS/IEC standards, promoting domestic manufacturing.
- 5-Year Comprehensive Maintenance: Registered vendors provide 5 years of comprehensive operation and maintenance including overhauling and regular system health checks.
- Group Housing Society Support: Resident Welfare Associations (RWAs) and Group Housing Societies can install common rooftop solar systems up to 500 kW capacity with a subsidy of ₹18,000 per kW.
- National Portal Integration: The entire process from application to subsidy disbursement is managed through a single National Portal, making it transparent and hassle-free.
- Employment Generation: The scheme is expected to create numerous employment opportunities in solar panel installation, manufacturing, and maintenance sectors.
Objectives of PM Surya Ghar Muft Bijli Yojana
The government has set clear objectives behind launching the PM Surya Ghar Muft Bijli Yojana. These objectives are:
- To install rooftop solar systems in one crore residential households across India by March 2027.
- To provide free or low-cost electricity up to 300 units per month to one crore households through rooftop solar installation.
- To generate 1,000 billion units of renewable electricity during the 25-year lifetime of the installed rooftop solar projects.
- To reduce carbon emissions by 720 million tonnes of CO2 equivalent during the 25-year project lifetime.
- To reduce electricity costs for households and save the government over ₹75,000 crore annually in electricity subsidies.
- To decrease dependency on traditional fossil fuel-based energy sources and promote clean and sustainable energy.
- To develop a complete ecosystem for rooftop solar including regulatory support, manufacturing facilities, supply chain, and vendor networks.
- To boost local economy and create employment opportunities for youth in solar installation, manufacturing, and maintenance.
- To help India achieve its commitment of installing 30 GW of solar capacity through rooftop solar by 2026-27 under UNFCCC NDCs.
- To encourage entrepreneurship opportunities for vendors in supply and installation of solar panels across the country.
Eligibility Criteria for PM Surya Ghar Muft Bijli Yojana
Before applying for the PM Surya Ghar Muft Bijli Yojana, it is very important to check whether you meet the eligibility criteria set by the government. If you do not fulfill these conditions, your application may get rejected. Here are the detailed eligibility criteria:
- Indian Citizenship: The applicant must be a citizen of India. Only Indian residents are eligible to apply for this scheme.
- Residential Property Ownership: The applicant must own a legally recognized residential property with sufficient rooftop space suitable for solar panel installation.
- Valid Electricity Connection: The applicant must have a valid electricity connection in their name at the residential property where solar panels will be installed.
- No Previous Solar Subsidy: The applicant must not have availed any other government solar subsidy earlier for the same property.
- Poor and Middle-Income Households: The scheme is primarily targeted at poor and middle-income families who want to reduce their electricity bills.
- Suitable Rooftop Space: The rooftop must have adequate shadow-free area to install the solar panels as per the recommended capacity.
- DISCOM Approval: The property must be located in an area covered by a participating electricity distribution company (DISCOM) that is registered under the scheme.
- ALMM-Approved Panels: The solar panels to be installed must be from the Approved List of Models and Manufacturers (ALMM) as prescribed by MNRE.
- Age Limit for Loans: If applying for a collateral-free loan, the applicant should be up to 65 years of age.
- Apartment and Rented House Conditions: Apartment owners with rooftop rights or RWAs can apply. For rented houses, the property owner must give written consent for installation.
Benefits of PM Surya Ghar Muft Bijli Yojana
The PM Surya Ghar Muft Bijli Yojana offers numerous benefits to households, the government, and the environment. Here is a detailed explanation of all the benefits:
Financial Benefits
- Huge Savings on Electricity Bills: Households can save up to ₹15,000 per year on electricity bills by generating their own solar power.
- Direct Subsidy up to ₹78,000: The government provides direct financial assistance of up to ₹78,000 for installing rooftop solar systems, significantly reducing the upfront cost.
- Additional Income from Surplus Power: Through net metering, households can sell excess electricity back to the grid and earn money from their solar installation.
- Collateral-Free Loans: Easy access to bank loans up to ₹20 lakh without any collateral makes solar installation affordable for middle-class families.
Environmental Benefits
- Reduction in Carbon Emissions: The scheme will help reduce 720 million tonnes of CO2 equivalent emissions over 25 years, contributing to a cleaner environment.
- Increased Use of Renewable Energy: Widespread adoption of rooftop solar will increase India’s renewable energy capacity and reduce dependence on coal and fossil fuels.
- Sustainable Energy Future: The scheme promotes clean energy usage, helping India meet its climate commitments under the Paris Agreement.
Economic and Social Benefits
- Employment Generation: The scheme creates thousands of jobs in solar panel manufacturing, installation, and maintenance sectors for skilled youth.
- Entrepreneurship Opportunities: Local vendors and small businesses get opportunities to become registered solar installers and earn livelihood.
- Government Savings: The scheme is expected to save the government over ₹75,000 crore annually in electricity subsidies.
- Energy Independence: Households become less dependent on the main power grid, ensuring uninterrupted electricity supply even during power cuts.
- Electric Vehicle Charging: Group Housing Societies can use common solar installations for EV charging facilities, promoting green transportation.
Application Procedure for PM Surya Ghar Muft Bijli Yojana
Applying for the PM Surya Ghar Muft Bijli Yojana is a simple and fully online process. You can complete the entire application from your mobile phone or computer without visiting any government office. Here is the detailed application procedure:
Online Application Process
- Step 1: Visit the Official Portal: Go to the official website https://www.pmsuryaghar.gov.in on your browser.
- Step 2: Consumer Registration: Click on the “Consumer” option and select “Apply Now” or open the Login dropdown and select “Consumer Login.”
- Step 3: Enter Mobile Number: Enter your valid registered consumer mobile number, fill in the captcha code, tick the box confirming you have read the scheme guidelines, and click on “Verify.”
- Step 4: OTP Verification: Enter the OTP received on your mobile through SMS and click on “Login.”
- Step 5: Complete Profile: After successful login, enter your profile details including consumer name, email address, full address, state, district, and PIN code. Click on “Save” to complete registration.
- Step 6: Apply for Solar Rooftop: Click on “Apply for Solar Rooftop” and select your state, district, and electricity distribution company (DISCOM). Enter your consumer account number and click on “Fetch Details.”
- Step 7: Fill Application Form: After your consumer details load, click on “Next” and fill in all required details for your rooftop solar application.
- Step 8: Submit Application: Review all details carefully and submit your application. You will receive an application reference number for future tracking.
- Step 9: Wait for Feasibility Approval: Your DISCOM will review your application and conduct a feasibility study. This usually takes 7 to 30 days.
- Step 10: Select Registered Vendor: Once feasibility is approved, log in to the portal and select a registered vendor from the list provided by your DISCOM.
- Step 11: Submit Bank Details: Upload your bank account details and a cancelled cheque to receive the subsidy through DBT.
- Step 12: Installation and Inspection: The vendor will install the solar system. After installation, DISCOM will inspect the site for compliance.
- Step 13: Net Meter Installation: Once inspection is cleared, the vendor will arrange for net meter installation and grid connectivity.
- Step 14: Receive Commissioning Certificate: After final approval, you will receive a commissioning certificate from DISCOM.
- Step 15: Subsidy Disbursement: The subsidy amount will be transferred directly to your bank account within 30 days of commissioning.
Offline Application Process
Currently, the PM Surya Ghar Muft Bijli Yojana does not have a dedicated offline application process. The entire application, from registration to subsidy disbursement, is managed through the National Portal. However, if you face difficulty in applying online, you can visit your nearest DISCOM office or Common Service Center (CSC) where staff can help you fill the online application. Some states may also have designated help desks at district offices to assist elderly or digitally illiterate applicants in completing the online registration and application process.
Important Dates of PM Surya Ghar Muft Bijli Yojana
Knowing the important dates related to the PM Surya Ghar Muft Bijli Yojana is crucial so that you do not miss any deadline. Here are all the important dates and timelines you should remember:
| Important Event | Date / Timeline |
|---|---|
| Scheme Launch Date | 13 February 2024 |
| Administrative Approval Date | 16 March 2024 |
| Operational Guidelines Issued | 07 June 2024 |
| National Portal Launch | 13 February 2024 |
| Application Start Date | 13 February 2024 |
| Last Date for Application | 31 March 2027 (Scheme End Date) |
| DISCOM Feasibility Approval | 7 to 30 days from application |
| Vendor Installation Period | As per agreement with vendor |
| DISCOM Inspection Period | Within 15 days of installation |
| Subsidy Disbursement | Within 30 days of commissioning |
| Target: 10 Lakh Installations | By March 2025 |
| Target: 20 Lakh Installations | By October 2025 |
| Target: 40 Lakh Installations | By March 2026 |
| Target: 1 Crore Installations | By March 2027 |
| Phase II Claims Last Date | 31 December 2025 |
The scheme is currently open and accepting applications. There is no last date for individual applications as such, but the overall scheme will close on 31 March 2027. It is advisable to apply as early as possible to avoid any last-minute rush and to get your installation completed well before the scheme ends. The DISCOM feasibility approval generally takes between 7 to 30 days depending on your state and the volume of applications. After installation, the DISCOM inspection and commissioning process may take another 15 to 30 days. Once everything is approved, the subsidy is credited to your bank account within 30 days.
Documents Required to Apply for PM Surya Ghar Muft Bijli Yojana
To apply for the PM Surya Ghar Muft Bijli Yojana, you need to keep certain documents ready. Without these documents, your application may get rejected or delayed. Here is the complete list of documents required:
- Proof of Identity: Aadhaar Card, PAN Card, Voter ID Card, Passport, or Driving License. Aadhaar is preferred as it is linked to DBT.
- Proof of Address: Aadhaar Card, Voter ID, Passport, Ration Card, or recent electricity bill showing your residential address.
- Electricity Bill: A copy of your latest electricity bill showing your consumer number, sanctioned load, and connection details.
- Roof Ownership Certificate: Document proving that you own the property or have legal rights to the rooftop where solar panels will be installed.
- Bank Account Details: Passbook front page scan, cancelled cheque, or bank e-statement showing your account number, IFSC code, and account holder name.
- Passport Size Photograph: Recent passport size photograph of the applicant for uploading on the portal.
- Mobile Number: An active mobile number registered in your name for OTP verification and status updates.
- Email ID: A valid email address for receiving application confirmations and updates.
- NOC from Society (if applicable): If you live in an apartment or group housing society, a No Objection Certificate from the RWA or housing society for rooftop installation.
- Property Owner Consent (for rented houses): Written consent from the property owner if you live in a rented house.
- Loan Documents (if applicable): If you are availing a collateral-free loan, loan account details and related documents from the participating bank.
How to Check PM Surya Ghar Muft Bijli Yojana Application Status
After applying for the PM Surya Ghar Muft Bijli Yojana, it is important to regularly check your application status to know at which stage your application is. The status check process is very simple and can be done online through the official portal. Here is the step-by-step process:
- Step 1: Visit the Official Portal: Open your browser and go to https://www.pmsuryaghar.gov.in.
- Step 2: Login to Your Account: Click on the “Login” option and select “Consumer Login.” Enter your registered mobile number and the captcha code. Click on “Verify” and enter the OTP received on your mobile to log in.
- Step 3: Go to My Applications: After logging in, look for the “My Applications” section on your dashboard and click on it.
- Step 4: View Status: Your current application status will be displayed on the screen along with the application reference number and date of application.
- Step 5: Check Detailed Status: Click on your application to see detailed status including feasibility approval, vendor assignment, installation, inspection, and subsidy stage.
| Status | Meaning |
|---|---|
| Application Submitted | Your application has been successfully filed under the scheme |
| Under Review | Your application is being verified by DISCOM officials |
| Feasibility Approved | DISCOM has approved your rooftop for solar installation |
| Vendor Assigned | A registered vendor has been assigned for your installation |
| Installation Completed | Solar system has been installed at your rooftop |
| Inspection Pending | DISCOM site inspection is yet to happen |
| Net Meter Installed | Net meter has been connected to the grid |
| Subsidy Initiated | Subsidy has been sent for release to your bank account |
| Subsidy Credited | Subsidy amount has been transferred to your bank account |
If your application status has not changed for several weeks, you can contact your assigned vendor for escalation, raise a query through the portal, or call the helpline number 15555 for assistance.
Application Fee and Scheme Fee for PM Surya Ghar Muft Bijli Yojana
One of the best things about the PM Surya Ghar Muft Bijli Yojana is that there is no application fee charged by the government for applying online through the National Portal. The entire registration and application process on the official website is completely free of cost. You do not need to pay any money to the government for submitting your application.
However, you should be aware of the following costs and fees associated with the scheme:
- Solar System Installation Cost: The actual cost of purchasing and installing the rooftop solar system has to be borne by the consumer initially. The vendor will charge you as per the mutually agreed cost. You can negotiate milestone-based payments with the vendor.
- Additional Civil Work: If your rooftop requires additional strengthening, customization, or civil work beyond the standard installation, the vendor may charge extra for such work. This will be billed separately with GST.
- Net Meter Cost: In most cases, the net meter supply, installation, and testing are included in the vendor’s scope. However, confirm this with your vendor before signing the agreement.
- Loan Interest: If you avail a collateral-free loan from participating banks, you will need to pay interest ranging from 7% to 13% per annum. The EMI amount can range from approximately ₹2,000 to ₹29,000 per month depending on your loan amount and tenure.
- Insurance Cost: Any insurance cost related to material transfer or storage before commissioning is generally included in the vendor’s scope as per the agreement.
The government subsidy of up to ₹78,000 is credited back to your bank account after successful installation and commissioning, which significantly reduces your overall investment. If you have taken a loan, the subsidy may first be adjusted against your outstanding loan amount, and any remaining amount will be credited to your bank account.
Latest Updates of PM Surya Ghar Muft Bijli Yojana
The PM Surya Ghar Muft Bijli Yojana has seen tremendous progress since its launch. Here are the latest updates about the scheme:
- Massive Growth in Installations: As of March 2026, over 32 lakh households have already received rooftop solar installations under the scheme, and more than 63 lakh applications have been received on the National Portal.
- Monthly Installation Rate: The scheme has achieved a monthly installation rate of 70,000 systems, which is ten times higher than the pre-scheme average.
- Subsidy Disbursed: The government has disbursed ₹14,771 crore as Central Financial Assistance till December 2025.
- State-Wise Additional Subsidies: Several states like Gujarat, Uttar Pradesh, Rajasthan, and Delhi are providing additional top-up subsidies over and above the central subsidy. For example, Uttar Pradesh offers up to ₹30,000 additional subsidy, while Gujarat offers up to ₹20,000 additional per consumer.
- Loan Facility Expanded: More than 12 public sector banks are now offering collateral-free solar loans under the scheme including SBI, PNB, Bank of Baroda, Canara Bank, and Union Bank of India.
- ALMM Compliance Strictly Enforced: The government has strictly mandated that only ALMM-approved solar panels manufactured in India can be used for installations under this scheme.
- 5-Year Comprehensive Warranty: All vendors must provide 5 years of comprehensive operation and maintenance including overhauling and regular health checks.
- Grievance Redressal Improved: The National Portal now has an improved grievance redressal system where complaints are resolved within 30 days with regular SMS and email updates to consumers.
Selection Process of PM Surya Ghar Muft Bijli Yojana
The selection process for the PM Surya Ghar Muft Bijli Yojana is based on eligibility verification and technical feasibility rather than a lottery or merit system. Here is how the selection works:
- Application Verification: Once you submit your application, the DISCOM verifies your consumer details, electricity connection, and documents uploaded on the portal.
- Technical Feasibility Study: DISCOM officials or their authorized agency conduct a technical feasibility study of your rooftop to check if it has adequate shadow-free space, structural strength, and grid connectivity for solar installation.
- Sanctioned Load Check: Your existing electricity sanctioned load is checked to ensure it matches the proposed solar plant capacity.
- Approval or Rejection: Based on the feasibility report, DISCOM either approves or rejects your application. If approved, you can proceed to vendor selection. If rejected, the reason is communicated through the portal.
- Vendor Assignment: After approval, you select a registered vendor from the DISCOM-approved list. The vendor then visits your site for a detailed survey.
- Installation and Commissioning: The vendor installs the system, and DISCOM inspects and commissions it. Once commissioned, you are officially selected as a beneficiary and the subsidy is released.
There is no waiting list or lottery system. Every eligible applicant who passes the technical feasibility check gets approved on a first-come-first-served basis until the target of one crore installations is achieved.
Common Mistakes While Applying for PM Surya Ghar Muft Bijli Yojana
Many applicants make simple mistakes while applying for the PM Surya Ghar Muft Bijli Yojana, which leads to delays or rejection. Here are the common mistakes you should avoid:
- Entering wrong consumer number or electricity account number while applying
- Uploading unclear or blurred copies of documents
- Using a mobile number that is not registered with the electricity connection
- Not checking the ALMM approval status of solar panels before vendor selection
- Selecting a vendor who is not registered or empanelled with your DISCOM
- Ignoring the rooftop feasibility and installing panels in shaded areas
- Not reading the scheme guidelines before applying
- Providing incorrect bank account details leading to subsidy transfer failure
- Delaying in responding to DISCOM queries or inspection schedules
- Not obtaining NOC from housing society before installation in apartments
- Signing the vendor agreement without reading the payment terms and warranty conditions
- Not keeping copies of all uploaded documents for future reference
Reasons for Application Rejection Under PM Surya Ghar Muft Bijli Yojana
Your application for the PM Surya Ghar Muft Bijli Yojana can be rejected for several reasons. It is important to know these reasons so that you can avoid them:
- Incomplete Application: Missing or incomplete information in the application form can lead to immediate rejection.
- Invalid Documents: Uploading fake, expired, or mismatched documents such as wrong identity proof or address proof.
- No Valid Electricity Connection: If you do not have a valid residential electricity connection in your name, your application will be rejected.
- Previous Subsidy Availed: If you have already received a government solar subsidy for the same property under any other scheme.
- Rooftop Not Feasible: If your rooftop does not have sufficient shadow-free area or structural strength for solar panel installation.
- Non-ALMM Panels: If the vendor installs solar panels that are not from the Approved List of Models and Manufacturers (ALMM).
- Mismatch in Consumer Details: If the details entered in the portal do not match with DISCOM records.
- Pending Electricity Dues: If there are pending electricity bill dues against your consumer number.
- Wrong Bank Details: Incorrect bank account number, IFSC code, or account holder name can cause subsidy transfer failure and application closure.
- Vendor Not Empanelled: If you get installation done by a vendor who is not registered with your DISCOM under the scheme.
How to Register and Login to PM Surya Ghar Portal
The PM Surya Ghar Muft Bijli Yojana has a dedicated National Portal where all activities from registration to subsidy tracking are managed. Here is how you can register and login:
Portal Registration Process
- Visit the official website https://www.pmsuryaghar.gov.in.
- Click on “Consumer” and then select “Apply Now” or click on the “Login” dropdown and choose “Consumer Login.”
- Enter your valid mobile number, fill the captcha code, tick the checkbox confirming you have read the guidelines, and click “Verify.”
- Enter the OTP received on your mobile and click “Login.”
- Fill in your profile details including name, email, address, state, district, and PIN code.
- Click “Save” to complete your registration on the portal.
Portal Login Process
- Go to https://www.pmsuryaghar.gov.in.
- Click on “Login” and select “Consumer Login.”
- Enter your registered mobile number and captcha code.
- Click “Verify” and enter the OTP sent to your mobile.
- Click “Login” to access your dashboard where you can apply, track status, and manage your applications.
Reset and Forget Password and Username for PM Surya Ghar Portal
If you forget your login credentials for the PM Surya Ghar portal, you can easily recover them using your registered mobile number. Here is the process:
- Forgot Password: Go to the login page and click on “Forgot Password.” Enter your registered mobile number and captcha code. Click on “Verify” and enter the OTP received on your mobile. You will then be able to set a new password for your account.
- Forgot Username: Since the portal uses your registered mobile number as the primary username for login, you do not need to remember a separate username. Just use the mobile number you registered with.
- Change Mobile Number: If you have changed your mobile number, you may need to contact the helpline number 15555 or visit your DISCOM office to update your registered mobile number in the portal.
- Account Locked: If your account gets locked due to multiple failed login attempts, wait for 30 minutes and try again, or contact the helpline for assistance.
Grievance Redressal Process for PM Surya Ghar Muft Bijli Yojana
If you face any issue or have a complaint regarding the PM Surya Ghar Muft Bijli Yojana, the government has set up a proper grievance redressal mechanism. Here is how you can raise and track your grievance:
- Raise Grievance Online: Log in to the National Portal and navigate to the grievance section. Fill in your complaint details and submit. A unique tracking ID will be generated for your grievance.
- Raise Grievance Through Call Centre: You can call the national helpline number 15555 and register your complaint. The call centre executive will provide you with a tracking ID.
- Raise Grievance Through Portal App: If available, you can also use the mobile app to raise grievances.
- Resolution Timeline: All grievances are required to be resolved within 30 days from the date of registration.
- Status Updates: You will receive regular updates about your grievance status through SMS and email on your registered contact details.
- Escalation: If your grievance is not resolved within 30 days, you can escalate it through the portal or contact the State Nodal Agency (SIA) for further action.
- Vendor Disputes: For disputes between you and the vendor regarding installation quality, payment, or maintenance, both parties must settle it mutually or as per law. MNRE and DISCOM will not intervene in consumer-vendor disputes.
Renewal Process for PM Surya Ghar Muft Bijli Yojana
The PM Surya Ghar Muft Bijli Yojana does not require any annual renewal of registration or application once you have received the subsidy and your system is commissioned. However, there are certain ongoing obligations and maintenance-related renewals you should know about:
- No Annual Renewal Required: The one-time registration and application on the National Portal is sufficient. You do not need to renew your application every year.
- 5-Year Vendor Maintenance: The registered vendor is responsible for comprehensive operation and maintenance for 5 years from the date of commissioning. This includes regular health checks, cleaning guidance, and repair of wear and tear.
- Net Metering Agreement Renewal: Your net metering agreement with the DISCOM may need periodic renewal as per your state’s electricity regulatory commission guidelines. Check with your DISCOM for renewal timelines.
- Warranty Claims: Individual component warranties from manufacturers (such as solar panels and inverters) may extend beyond the 5-year vendor maintenance period. Keep your warranty documents safe for future claims.
- System Upgradation: If you want to upgrade your system capacity beyond 3 kW after initial installation, you may need to submit a fresh application for the additional capacity as per current guidelines.
- Bank Account Updates: If you change your bank account, update the details on the portal immediately to avoid any issues with future payments or refunds.
Important Links and PDFs of PM Surya Ghar Muft Bijli Yojana
Here are the official links and important PDFs related to the PM Surya Ghar Muft Bijli Yojana:
- Official National Portal: https://www.pmsuryaghar.gov.in
- Ministry of New and Renewable Energy (MNRE): https://mnre.gov.in
- Operational Guidelines PDF: Available on the MNRE website under the PM Surya Ghar scheme section
- Model Agreement between Consumer and Vendor: Available as Annexure 2 in the official guidelines
- Model Net Metering Agreement: Available as Annexure 4 in the official guidelines
- ALMM List of Approved Solar Panels: https://almm.mnre.gov.in
- List of Empanelled Vendors: Available on your respective DISCOM website or the National Portal
- State Nodal Agency Contacts: Available on the MNRE website under state-wise renewable energy departments
Contact and Information of PM Surya Ghar Muft Bijli Yojana
If you need any help or have queries regarding the PM Surya Ghar Muft Bijli Yojana, you can use the following contact details:
- National Helpline Number: 15555 (Toll-Free)
- Official Website: https://www.pmsuryaghar.gov.in
- Ministry Address: Ministry of New and Renewable Energy, Atal Akshay Urja Bhawan, Lodhi Road, New Delhi – 110003
- Email Support: Available through the National Portal grievance section
- State DISCOM Offices: Visit your local electricity distribution company office for state-specific queries
- Common Service Centers (CSC): Visit your nearest CSC for assistance with online application
- Registered Vendor Contact: Contact your assigned vendor for installation-related queries
- Social Media Updates: Follow MNRE official social media handles for latest announcements
Frequently Asked Questions (FAQs) About PM Surya Ghar Muft Bijli Yojana
Q1: What is the maximum subsidy amount under PM Surya Ghar Muft Bijli Yojana?
The maximum subsidy amount is ₹78,000 for rooftop solar systems up to 3 kW capacity. For systems up to 2 kW, the subsidy is ₹30,000 per kW, and for additional capacity from 2 kW to 3 kW, it is ₹18,000 per kW.
Q2: How much free electricity can I get under this scheme?
Eligible households can get up to 300 units of free electricity per month depending on their solar plant capacity and usage. This can help you save approximately ₹15,000 per year on electricity bills.
Q3: Can I apply if I live in a rented house?
Yes, you can apply if you live in a rented house, but you need written consent from the property owner. The subsidy will be linked to the rooftop ownership and the owner’s electricity connection.
Q4: How long does it take to get the subsidy after installation?
The subsidy is transferred directly to your bank account within 30 days of successful installation, DISCOM inspection, and commissioning of the system.
Q5: Is there any application fee for applying online?
No, there is no application fee for registering or applying on the official National Portal. The entire online application process is completely free.
Q6: What is ALMM and why is it important?
ALMM stands for Approved List of Models and Manufacturers. It is a government-approved list of solar panel manufacturers. Only ALMM-approved panels can be used under this scheme. If non-approved panels are installed, your subsidy may be rejected.
Q7: Can apartment owners apply for this scheme?
Yes, apartment owners can apply if they have rooftop ownership rights or if the Resident Welfare Association (RWA) permits common rooftop solar installation. RWAs can also install shared systems up to 500 kW capacity.
Q8: What banks offer collateral-free loans under this scheme?
Participating banks include SBI, PNB, Bank of Baroda, Canara Bank, Union Bank of India, Bank of India, Indian Bank, Central Bank of India, and others. You can get loans up to ₹20 lakh at interest rates of 7% to 13% per annum.
Q9: What should I do if my application status is stuck for weeks?
If your status has not changed for several weeks, contact your empanelled vendor for escalation, raise a query through the National Portal, or call the helpline number 15555.
Q10: What is the last date to apply for PM Surya Ghar Muft Bijli Yojana?
The scheme is open till 31 March 2027. However, it is advisable to apply early to ensure you get your installation and subsidy well before the scheme ends.